3-4-3-9: BACKFILL:
   After the concrete has been cured, forms shall be removed and the space near the edges of the sidewalk or driveway apron shall be backfilled to the required elevation with material approved by the Building Department. The material shall then be compacted until firm and the surface evenly graded.