§ 150.061 EXTENDED CONSTRUCTION SHUTDOWN PERIOD.
   Disturbed areas shall be stabilized with temporary or permanent measures within seven calendar days following the end of active disturbance or redisturbance. The condition of the construction site for the winter shut down period shall address proper sediment and erosion control early in the fall growing season. Stabilization measures include seeding, mulching, sodding or erosion control blankets.
(Ord. 2004-008, passed 6-16-04)