1361.02 HEATING, VENTILATING, AIR CONDITIONING AND REFRIGERATION FEES.
 
(a)   Heating Systems.
   Commercial RTU, split systems and combinations      $80.00
   Residential new furnace (any type of fuel)         40.00
   Each additional heat run               2.00
   Each gas or liquid-fired infra-red radiant heaters
      up to ten units                  20.00
   Each additional unit                  5.00
   Each space heater (20,000 BTU capacity or over)      20.00
   Replacements (furnaces only)
      No fuel change               40.00
      Gas piping inspections            30.00
   Additions or alterations
      Moving location of furnace, changes to duct
      work, blowers, controls, thermostat etc.      30.00
 
(b)   Refrigeration Systems; (not regulated under Pressure Piping Systems OAC 4101:4)
   First 3 ton capacity or fraction            $30.00
   Each additional ton or fraction            3.00
   Water-cooled air conditioning systems up to five tons
      utilizing public water supply and which require
      drainage lines:                  30.00
      Each additional ton               3.00
   Air-cooled air conditioning systems having a capacity
      of one ton or more:
      First one ton capacity               30.00
      Each additional ton or fraction         3.00
   Pressure piping inspection               40.00
   Minimum permit fee                  30.00
   Reinspection fee                  25.00
   Plan review fee                  60.00
 
(c)   Boilers, Unit Heaters, Etc., Fees: The fees for the inspection of installation and replacement of steam and hot water boilers, power boilers, pressure reducing stations, radiators, gas steam radiators and solar collectors, not regulated under OAC 4101:4-1 through 4101:4-17 shall be as follows:
   Steam and hot water boilers - new system/replacements
      with new or replacement rated 125,000 BTUs
      or less, each                  40.00
      Additional 50,000 BTU or fraction thereof, each   6.00
   Power boilers,
      New or replacement, each            30.00
      Pressure reducing station, each         15.00
   Solar heating (Air)                  30.00
   Minimum warm air heating & air conditioning fee      30.00
   Re-inspection fee                  25.00
   Gas piping                     40.00
   Commercial plan review               60.00
   (Ord. 155-2005. Passed 11-28-05.)