1105.02 ZONING PERMIT REQUIRED.
   No building or other structure shall be erected, moved, added to, structurally altered, nor shall any building, structure, or land be established or changed in use without a permit therefor, issued by the Zoning Inspector. Zoning permits shall be issued only in conformity with the provisions of this Zoning Ordinance.
   Upon written request from the owner and/or tenant, the Zoning Inspector shall issue a zoning permit for any building or premises existing at the time of enactment of this Ordinance certifying, after inspection, the extent and kind of use made of the building or premises and whether such use conforms to the provisions of this Ordinance. A charge shall be made for issuing a zoning permit in accordance with Section 1105.09.
   A zoning permit shall be required for any of the following:
   (a)   Construction or structural alteration of any building moved, added to, altered or erected.
   (b)   Change in use of an existing building or structure to a use of a different classification.
   (c)   Change in the use of land to a use of a different classification.
   (d)   Any change in the use of a nonconforming use.
   (e)   A zoning certificate shall be required for all lawful nonconforming uses of land or buildings created by adoption of this resolution or any amendments.
      (Ord. 164-1984. Passed 1-28-85.)