To receive final inspection and acceptance of any project, or portion thereof, the following must be completed by the applicant and provided to the Orange Village Engineer:
(a) Final stabilization must be achieved and all permanent SCMs must be installed and made functional, as determined by the Orange Village Engineer and per the approved Comprehensive Stormwater Management Plan.
(b) An As-Built Certification, including As-Built Survey and Inspection, must be sealed, signed, and dated by a Professional Engineer and a Professional Surveyor with a statement certifying that the SCMs, as designed and installed, meet the requirements of the Comprehensive Stormwater Management Plan approved by the Orange Village Engineer. In evaluating this certification, the Orange Village Engineer may require the submission of a new set of SCM calculations if he/she determines that the design was altered significantly from the approved Comprehensive Stormwater Management Plan. The As-Built Survey must provide the location and dimensions, of such SCMs.
(c) A copy of the complete Inspection and Maintenance Plan and Inspection and Maintenance Agreement as specified in Section 1377.08 must be provided to Orange Village..
(Ord. 2022-9. Passed 7-6-22.)