(a) Measures shall be taken to minimize erosion and its impacts during subdivision construction activity. Detailed erosion control plans setting forth the techniques to be used both temporarily (during construction) and permanently, and a schedule for implementing or installing same shall be submitted with the final plat. All erosion control devices shall be in place at the start of construction and other measures implemented according to the approved time schedule.
(b) Erosion control plans shall be designed to control erosion on-site, with the object of eliminating or minimizing erosion or sedimentation impacts off-site. Techniques, devices, or measures used shall be in accordance with the standards contained in Chapter 1377.
(Ord. 1999-47. Passed 10-13-99.)