In addition to the other storm drainage requirements set forth in this Chapter, stormwater runoff control shall be provided. In general, it is the intent of this section to control the discharge rate of stormwater to prevent accelerated runoff, flooding and stream channel erosion that occurs as a result of development. The design and construction of stormwater detention facilities shall be in accordance with Chapter 1377.
(Ord. 1999-47. Passed 10-13-99.)