901.04 RESTORATION OF PAVEMENT AND OTHER SURFACES.
   (a)    The restoration of the pavement or other surface in public rights of way shall be performed to the satisfaction of the Village Engineer in accordance with the specifications used by the Village for its public roads. Restoration of other surfaces in other public or private rights of way shall be to the condition of those surfaces prior to the opening or excavation and other work.
   (b)    Upon failure or refusal of the permittee to satisfactorily fill the excavation, restore the surface, and remove all excess materials within the time specified in the permit or, where not specified therein, within a reasonable time after commencement of the work, the Village, after twenty-four (24) hours-notice to the applicant for the right of way permit, may fill any excavation, restore the site, remove excess materials, and perform any other work necessary to complete the project. The costs incurred by the Village in performing such work shall be paid out of the deposit made under Section 901.02, if such a deposit has been made, or invoiced to the Contractor or owner of the facility for whom work was being performed. If the cost of such restoration exceeds the amount of such deposit, the proper officer of the Village shall proceed to collect the remainder due from such Contractor or the owner of the facility for whom the work was performed, and no permit shall be subsequently granted to such Contractor or facility owner until such restoration costs are paid. (Ord. 2021-11. Passed 8-4-21.)