§ 51.02  MINIMUM CHARGES.
Meter Size, Gallons
Proposed through December 31, 2019
Proposed beginning
January 1, 2020
Meter Size, Gallons
Proposed through December 31, 2019
Proposed beginning
January 1, 2020
5/8-inch meter, 1400
$12.22
$13.87
3/4-inch meter, 3,000
$25.69
$29.16
1-inch meter, 5,000
$42.15
$47.84
1-1/4-inch meter, 8,000
$64.47
$73.19
1-1/2-inch meter, 10,000
$79.35
$90.09
2-inch meter, 16,000
$120.51
$136.89
3-inch meter, 30,000
$208.55
$236.99
4-inch meter, 50,000
$329.75
$374.79
6-inch meter, 100,000
$604.25
$686.29
 
(1996 Code, § 9-29)  (Ord. 2008-03, passed 11-24-2008; Ord. 2018-8, passed 12-27-2018)