Site plan requirements are as follows:
(A) Present and proposed use of land, the arrangement of all existing and proposed buildings, structures, roads, drives, parking areas, septic systems (tank, line and leachfield), underground utilities lines, wells, surface drainage, landscaping, fencing and all other features and facilities to be installed or used in connection with the proposed operation;
(B) All existing natural features on property including tree lines, surface water features, wetlands, 100-year floodplains and features of karst terrain. Known habitats of state or federally listed threatened or endangered species on property and within 500 feet of the property boundary. The use of remote sources of information such as aerial photography and published information may be employed;
(C) Existing and proposed contours of not less than two-foot intervals as follows:
(1) The present surface of all property within 250 feet of the CDDL footprint and all associated facilities by use of distinguished line types or colors;
(2) The ultimate depth elevations of the CDDL by use of distinguished line types or colors; and
(3) The ultimate finished surface of the site after all filling operations are completed by use of distinguished line types or colors.
(D) Structural or engineering details for the following;
(1) Final cap cover;
(2) Stormwater conveyance system and structures;
(3) Liner construction;
(4) Leachate collection system;
(5) Groundwater monitoring wells (if applicable);
(6) Truck tire cleaning facilities;
(7) Soil erosion and sediment control measures;
(8) Excavation details including stockpile areas and borrow areas;
(9) Driveway construction;
(10) Profiles and cross-sections of the CDDL showing the CDD material, cap, extent of excavation, depth to seasonal high water table, depth to bedrock; and
(11) Location of soil boring(s).
(E) Locations where filling operations will commence and the anticipated procedural sequence of operations;
(F) The calculated volumes of materials to be filled for each location or waste cell on the site where operations are to take place;
(G) Names and addresses of all adjoining property owners, scale, northpoint and relationship of site to existing public streets;
(H) All site plans must be signed, sealed and prepared under the direction of a professional engineer licensed in the state; and
(I) The title block of the site plan shall identify the name and address of the company or person who prepared the plans as well as the date of the last plan revision.
(Ord. KOC 97-830-53, passed 9-2-1997)