§ 151.071 CRITICAL FACILITIES.
   (A)   Construction of new critical facilities shall be, to the extent possible, located outside the limits of the SFHA (100-year floodplain). Construction of new critical facilities shall not be permissible within the floodway; however, they may be permissible within the SFHA if no feasible alternative site is available. Critical facilities constructed within the SFHA shall have the lowest floor elevated one foot or more above the level of the base flood elevation at the site. Floodproofing and sealing measures must be taken to ensure that toxic substances will not be displaced by or released into floodwaters. Access routes elevated to or above the level of the base flood elevation shall be provided to all critical facilities to the extent possible.
   (B)   Critical facilities shall be constructed on properly compacted fill and have the lowest floor (including basement) elevated at least one foot above the elevation of the 500-year flood. A critical facility shall have at least one access road connected to land outside the 500-year floodplain, and the road must be capable of supporting a 12,500-pound vehicle. The top of the road must be no lower than six inches below the elevation of the 500-year floodplain.
(Ord. KOC 06-360-411, passed 9-5-2006; Ord. KOC 21-360-201, passed 3-16-2021)