The Solid Waste Coordinator shall approve the finished land elevation to be attained at the disposal site for the incinerated material, if the incinerated material is disposed of in a fill. There shall be a minimum of two feet of soil cover over the final filling operation.
(Ord. KOC 99-830-199, passed 6-1-1999)