13.42.415: STUB STREET DRAINAGE REQUIREMENTS:
When a stub street is included in a subdivision design, it shall include provisions for drainage of the stub street until such a time as the stub street is connected to the extended street system. Design of stub streets will contain the following minimum provisions for drainage:
   A.   Stub streets which drain into the development under design will not require special drainage structures.
   B.   Stub streets which drain away from the development will require a drainage easement on the adjoining property with a one percent (1%) chance storm flow capacity ditch to a point of natural drainage or concrete curb and gutter across the end of the street, with storm inlets tied to an operational storm sewer system. (Ord. 1969, 2011)