1351.03 INSPECTION PRIOR TO COVERING.
   All electrical wire conduit outlets, receptacles, switches and circuit breakers shall be installed on the job site and no drywall or wall covering shall be installed until same has been inspected.
(Ord. 36-03. Passed 5-19-03.)