All roof mounted mechanical equipment shall be fully screened on all four sides, with a height to exceed the installed equipment, by raising the parapet around the top of the building, with material compatible with the building material; see paragraph 1341.02
(h).
(Ord. 36-03. Passed 5-19-03.)