If during the prosecution of work and subsequent to the issuance of a permit, it is necessary to make any changes in the plans or contract, the permit holder shall notify the Building Inspector in writing of the proposed changes including a revised site plan, architectural review letter, if required, and construction drawings, along with a check in the amount of the appropriate re- review fee plus the cost of document examination. If approved, the charges shall be added to the original permit fee, if the cost of the work is thereby increased so much as to require a higher permit fee, that additional sum shall also be collected in accordance with the schedule set forth herein.
(Ord. 14-06. Passed 5-22-06.)