6-15-2: FAILURE TO ACQUIRE PERMITS:
   A.   Any person, firm or corporation who fails to obtain any permit(s) required by this title before proceeding with the erection, construction, alteration, repair, remodeling, removal or excavation of any building or structure, or part thereof, shall be required to obtain said permit(s) and shall be charged double the applicable fee or fees.
   B.   Any person, firm or corporation who fails to obtain any permit(s) required by this title before proceeding with the erection, construction, alteration, repair, remodeling, removal or excavation of any building or structure, or part thereof, a second time within a twenty four (24) month period, shall be required to obtain said permit(s) and shall be charged double the applicable fee or fees therefor, and shall also be required to pay double the applicable fee or fees for all permits required by this title which are applied for by said person, firm or corporation during the twenty four (24) month period following said second failure to obtain any such permits. (Ord. 04-03-12)