TABLE VI: STREET IMPROVEMENTS
Ord. No.
Date Passed
Description
Ord. No.
Date Passed
Description
581
10-3-67
Improving of State Route 105 on the West Water Street by the installation of modern highway automatic flashing light signals to replace existing wig-wag signals at the crossing of the Norfolk and Western Railway.
593
9-16-69
Determining to proceed with the improvement of Washington Street by paving Washington Street between Toussaint Street and Benton Street in the village.
651
6-4-74
Improvement of the passive signing in conformance with the Ohio Manual of Uniform Traffic Control Devices, at all railroad-highway grade crossings within the village.
681
12-7-76
Improvement of State Route 163 to widen existing facility to provide two, 12-foot lanes, provide full width overlay, improve horizontal alignment, perform necessary grading, drainage, and related work.
690
4-18-78
Improvement of State Route 163 to seal berms (Type 409).
708
11-6-79
Improvement of the passive signing at railroad-highway grade crossing by the modernization of existing flashing light signals and addition of roadway gates at the grade crossings of Water Street and the tracks of the Norfolk and Western Railway Company.
739
3-7-83
Resurfacing of Locust Street.
1-84
3-19-84
Improvement of State Route 163 and Water Street from the west corporation line to Benton Street and Finke Road to east corporation line; total length of project being .97 miles to seal the berm (Type 409).
11-85
12-16-85
Improvement of State Route 105 from the west corporate line to State Route 19 (Locust Street) to consist of resurfacing the pavement with asphalt concrete (Type 404).
4-87
3-16-87
Improvement of State Route 19 from the south corporation line to the north corporation line and State Route 163 from State Route 19 to the east corporate line to consist of milling and resurfacing with asphalt concrete (Type 404).
26-89
12-19-89
Improvement of State Route 19 (Locust Street) from 0.10 miles, south of State Route 163 to 1.09 miles, north of State Route 163 to rebuild the combination sewer underlying State Route 19 in the village and replace pavement removed from sewer rebuilding.
2-91
4-15-91
Improvement of State Route 19 from the north corporation line, east side of highway, SLM 4.55 to the north corporation line, west side of highway, SLM 4.60 to consist of resurfacing the pavement with asphalt concrete (Type 404).
5-91
6-3-91
Improvement of State Route 19 (Locust Street) at its crossing of the Portage River to replace structure over the Portage River, provide adequate approaches and electrical raceways and manholes for future use by the village.
1-93
1-4-93
Improvement of State Route 163 from west corporate line (SLM 13.18) to State Route 105 (SLM 13.81) to consist of grinding the existing pavement at the curb lines and resurfacing with asphalt concrete (Type 404).
3-96
2-5-96
Improvement of State Route 19 (Locust Street) from the south corporate line to an existing construction joint located .09 miles south of the north corporate line, total length of project being 1.24 miles more or less, to rehabilitate the existing pavement by grinding along the curb line, full width pavement overlay and the performance of other necessary work.
08-2000
3-6-00
Improving a portion of State Route 105, from State Route 163 to State Route 19; and a portion of State Route 163, from State Route 19 to State Route 358.
09-2000
3-20-00
Improving North Railroad Street.
02-2005
2-22-05
Improving Locust Street.
8-2016
1-17-17
Resurfacing State Route 105 from the village to State Route 163 and State Route 163 to State Route 358.
08-2021
11-15-21
Replacing existing structure with simple span concrete composite pre-stressed beam bridge; perform necessary related work.
6-2022
8-15-22
Resurfacing State Route 19 from Portage River to Oak Harbor village limits and State Route 163 from near State Route 590 to Oak Harbor village limits.