All utilities will be front lot line. No exceptions. Gas, power, water, phone, sewer and storm drains will all be underground. Gas and power will be in separate trenches with a minimum of a three-foot separation of undisturbed earth, if any utilities share a trench, it will have a two-foot selection side to side.
(Prior Code, § 10-9-5) (Ord. 2001-02, passed 10-3-2001)