919.17 STANDARDS FOR REPAIRS AND RESTORATION.
   (a)   Permittee Responsibility. The Permittee shall be fully responsible for the cost and actual performance of all Work in the public way. The Permittee shall do all Work in conformance with any and all engineering regulations, construction specifications, and design standards adopted by the City. These standards shall apply to all Work in the public way unless otherwise indicated in the Permit.
  
   (b)    All restoration shall result in a Work site condition equal to or better than that which existed prior to construction.
(Ord. 14-2002. Passed 1-8-02.)