1187.04 STANDARD CONDITIONS.
   The following conditions shall be met:
 
      A.   Pipelines
 
         All oil or gas produced shall be carried away by pipelines unless stored in underground tanks.
 
      B.   Derricks to be Removed
 
         Derricks shall be removed from each well within thirty (30) days after the drilling of such well has been completed and thereafter, when necessary, such completed wells shall be serviced by portable derricks.
 
      C.   Fencing and Landscaping
 
         The drilling site shall be landscaped and maintained in a sightly condition. Fences shall be erected around the entire site or portions thereof where such fencing is necessary for the protection of the public safety.
 
      D.   Refining
 
         Except in any M District, no refining process or any process for the extraction of products from natural gases shall be carried on at the drilling site.
 
      E.   Equipment
 
         Electrical equipment, steam-driven equipment, or internal combustion engines may be employed in the drilling or pumping operations. If internal combustion engines are used, mufflers shall be installed on the mud pumps and engines.
 
      F.   Waste Disposal
 
         All waste substances such as drilling muds, oil, brine, or acids produced or used in connection with oil drilling operations shall be retained in watertight receptors from which they may be piped or hauled for terminal disposal in dumping areas designated or approved by the Huron County Board of Health or the Health Officer.
 
      G.   Review
 
         The Zoning Inspector shall cause all applications, hereunder, to be reviewed by the Director of Public Service and Safety.