927.12 PERMITS FOR SUPPLY AND SECONDARY LINES.
   Any extension or construction of electric supply or signal lines must be approved by the Director of Public Service and Safety before electricity can be turned on, and a permit must be obtained from the Director before work on the same is started.
(1961 Code Sec. 311)