8-5-11: APPLICATION FOR PERMIT:
   A.   Filing: Application for a construction stormwater discharge permit shall be filed with the city engineer. Contractors are required to obtain a permit prior to commencement of work. Each permit application shall bear the name and address and contact information of the owner of the site, developer of the site, contractor working at the site, and of any consulting firm retained by the applicant. The application shall be accompanied by a filing fee and a site specific stormwater pollution prevention plan.
   B.   Bond Or Other Security Required: The applicant is required to file a faithful performance bond, letter of credit, or other improvement security in an amount deemed sufficient by the engineering department to cover all costs of implementation and maintenance of the approved erosion and sediment control plan, including costs for improvements, landscaping and maintenance of improvements for such period as specified by the city, and also to cover engineering and inspections costs and the cost to repair improvements installed on the site and damaged by uncontrolled erosion and sediment from the construction site. (Ord. 2016-12, 8-16-2016)