(A) Utility lines. A minimum five-foot wide easements for sewers, water mains, electric lines or other public utilities shall be dedicated along the front, side and rear lot or parcel lines of each lot. Easements shall be centered on lot lines. Properties with alley access are only required to have easements in the front and rear lot lines.
(B) Watercourses. If a tract is traversed by a watercourse such as a drainage way, channel or stream, a storm water easement or drainage right-of-way shall be provided which substantially parallels the lines of the watercourse.
(C) Pedestrian and bicycle ways. When desirable for public convenience and access, a pedestrian or bicycle way easement may be required to connect to a cul-de-sac or to pass through an unusually long or oddly spaced block, or to otherwise provide appropriate circulation.
(Prior Code, § 16.125.20) (Ord. 427, passed 5-16-2016)