(a) Standards for Construction: The subdivider and contractors shall comply with the Village Standards for Construction - Details and Specifications. It is the subdivider's responsibility to provide the Village Engineer all required proof that materials and workmanship meet or exceed Village and Lake County requirements.
(b) Pre-construction Meeting. Before construction shall begin, the subdivider, all primary contractors and Utility representatives shall attend a pre-construction meeting with the Village Engineer. Minutes shall be maintained of all such construction meetings and distributed to the Planning Commission for review and file retention.
(c) Project Adjustment Documentation: Decisions to modify requirements or make field adjustments by the Village Engineer as shall be allowed in this Regulation shall be fully documented, dated, signed and distributed to the Planning Commission for review and file retention.
(d) Inspection Notification: The subdivider and contractor shall notify the Village Engineer and the assigned job Inspector two working days in advance of any construction to utilities, roads, grading, stormwater systems, sidewalks, restoration work, landscaping or for any other village inspection requirement that may be required by the Village Engineer. Failure to notify may result in removal, and replacement of undocumented work as required by the Village Engineer.
(e) Public Safety:
(1) The subdivider and contractor shall employ flagmen and watchmen on the work site if deemed necessary by the Village Engineer or as directed by the Mayor or Village Council for the safety of the public.
(2) The subdivider and contractor shall erect and maintain strong and suitable reflective traffic warning devices, barricades, cones, barrels and signs to direct traffic and prevent accidents to people, vehicles and property. Such devices shall be installed prior to work in any right-of-way or as additionally required by the Village Engineer, the Mayor or Village Council for the safety of the public.
(3) The Subdivider and contractor shall comply with all Ohio Department of Transportation regulations for maintaining traffic, safety notification and construction methods.
(4) No manhole or utility excavation shall be left open awaiting connection or repair or removal at a later date without backfill, resurfacing and the placement of warning devices and lights.
(f) Testing and Inspection Costs: Specimens, testing and inspections as required in the Standards for Construction or as may be additionally required by the Village Engineer shall be at the expense of the subdivider.
(g) Experts and Consultant Cost: Consultants, experts, service technicians and contractors may be retained by the Village Engineer, Village Solicitor and Zoning Inspector as necessary to provide advice, design, administrative support and technical evaluations for the project. These technical and administrative support costs shall be at the expense of the subdivider and applied to deposits made by the subdivider to North Perry Village.
(Ord. 19-10. Passed 11-7-19.)