1133.09 PONDS, LAKES AND WATER RETENTION.
   (a)    A pond, lake or water retention basin or excavation shall require a zoning permit.
   (b)    All ponds, lakes and water retention basins shall be located a minimum of fifteen (15) feet from any property line, or a distance equal to three (3) feet for every foot of depth of water, whichever is greater.
   (c)    An approved Lake County Soil and Water Conservation plan shall be required for a zoning permit for all ponds, lakes and water retention basins.
   (d)    All lakes and water retention systems larger than one (1) acre in area of water surface shall require an engineered drawing to be submitted with the zoning permit application.
(Ord. 19-10.  Passed 11-7-19.)