(a) Application Form. The subdivider shall apply in writing on a form obtained from the Zoning Inspector, and shall comply with the Submission Requirements set forth for subdivision final plat review.
(b) Deposits and Fees.
(1) The subdivider shall be responsible for payment of all deposits and fees at the time the Final Plat application is submitted.
(2) For administrative costs and inspection costs of construction of roadway, utilities other than sewer and water, grading, landscape, and drainage items the subdivider shall deposit with the Zoning Inspector a fee equal to two percent (2%) of the approved estimated cost of construction prior to the commencement of construction. In the event that the deposit exceeds the actual cost, the Village Clerk-Treasurer shall refund the remaining deposit.
(3) For inspection of the construction of sanitary and water improvements, fees are established by the Lake County Utilities Department. The subdivider shall provide evidence that these fees have been paid or deposited.
(4) Failure to submit all required deposits, fees and payments with the application for the Final Plat shall be cause for the Zoning Inspector to stop further progress of the project.
(c) Prior Approval by Zoning and Engineering. The Village Engineer shall confirm the documentation complies with all Village subdivision rules and engineering requirements. The Village Engineer and Zoning Inspector shall document their approval or rejection of these documents. (Ord. 19-10. Passed 11-7-19.)