1321.04 ELECTRICAL PERMIT FEES.
   The following fee schedule shall prevail for all electrical work to be performed:
(a)
Residential, new construction, additions, or alterations
(1)
Base fee, plus:
50.00
(2)
Per outlet and switches
2.00
(3)
Outlets over 200 volts, panels, disconnects, and meter bases, each
10.00
(4)
Power outlets: transformers, generators, batteries (prime and second), rectifiers, electrostatic filters and motors, including controls, distribution and connections thereto, each:
Up to 1 HP
12.00
Over 1 HP, up to 15 HP
25.00
Over 15 HP
35.00
(b)
Commercial or industrial, new construction or addition
(1)
Base fee, plus:
75.00
(2)
Per outlet and switches
2.50
(3)
Parking lot light fixtures (per pole)
50.00
(4)
Outlets over 200 volts, panels, disconnects, and meter bases, each
15.00
(5)
Power outlets: transformers, generators, batteries (prime and second), rectifiers, electrostatic filters and motors, including controls, distribution and connections thereto, each:
Up to 1 HP
12.00
Over 1 HP, up to 15 HP
25.00
Over 15 HP
35.00
(6)
X-ray machine and equipment, each
45.00
(7)
Fire alarm control panel, initiating, and annunciating device, each
2.50
         (Ord. 2017-19. Passed 2-21-17.)