§ 51.06 RATES AND CHARGES INSIDE TOWN LIMITS.
   The water rates and charges shall be based on the quantity of water used on or in the property or premises as measured by the water meter there in use.
   (A)   Metered rates per month (per 1,000 gallons).
 
Metered Rates Per Month
(Per 1,000 Gallons)
Phase I
(10-1-2022)
Phase II
(4-1-2023)
Phase III
(10-1-2023)
Phase IV
(4-1-2024)
First 5,000 gallons
$6.22
$6.53
$6.86
$7.20
Next 5,000 gallons
$5.46
$5.92
$6.22
$6.53
Next 5,000 gallons
$4.60
$4.83
$5.07
$5.32
Next 10,000 gallons
$3.66
$3.84
$4.03
$4.23
Next 25,000 gallons
$3.03
$3.18
$3.34
$3.51
Over 50,000 gallons
$2.61
$2.74
$2.88
$3.02
Size of Meter
Minimum Charge Per Month
Phase I
(10-1-2022)
Phase II
(4-1-2023)
Phase III
(10-1-2023)
Phase IV
(4-1-2024)
Size of Meter
Minimum Charge Per Month
Phase I
(10-1-2022)
Phase II
(4-1-2023)
Phase III
(10-1-2023)
Phase IV
(4-1-2024)
5/8”
$20.70
$21.75
$22.85
$24
3/4”
$34.55
$36.30
$38.10
$40
1”
$68.55
$72
$75.60
$79.40
1-1/2”
$119.90
$125.95
$132.25
$138.85
2”
$188.20
$197.70
$207.60
$218
3”
$256.60
$269.55
$283.05
$297.20
4”
$513
$538.90
$565.85
$594.15
6”
$1,025.80
$1,077.60
$1,131.50
$1,188.10
 
   (B)   Fire protection charges.
 
Phase I
(10-1-2022)
Phase II
(4-1-2023)
Phase III
(10-1-2023)
Phase IV
(4-1-2024)
Public hydrant rental fee - per meter - per month
$7.21
$7.57
$7.95
$8.35
Private hydrants - per hydrant - per annum
$769.49
$808.35
$848.77
$891.21
 
   (C)   Fire sprinkler connections (per annum)
      Size of sprinkler connection.
Size of Sprinkler Connection
Minimum Charge Per Month
Phase I
(10-1-2022)
Phase II
(4-1-2023)
Phase III
(10-1-2023)
Phase IV
(4-1-2024)
Size of Sprinkler Connection
Minimum Charge Per Month
Phase I
(10-1-2022)
Phase II
(4-1-2023)
Phase III
(10-1-2023)
Phase IV
(4-1-2024)
2”
$85.75
$90.10
$94.60
$99.35
3”
$192.55
$202.25
$212.35
$222.95
4”
$342.05
$359.30
$377.25
$396.10
5”
$534.40
$561.40
$589.45
$618.90
6”
$769.50
$808.35
$848.75
$891.20
8”
$1,368.05
$1,437.15
$1,509
$1,584.45
10”
$2,137.45
$2,245.40
$2,357.65
$2,475.55
 
   (D)   Public drinking fountains (per annum).
 
Phase I
(10-1-2022)
Phase II
(4-1-2023)
Phase III
(10-1-2023)
Phase IV
(4-1-2024)
Per fountain installed
$253.95
$266.75
$280.10
$294.10
 
(Ord. 2018-15, passed 11-19-2018; Ord. 2022-04, passed 9-19-2022)