1042.07   PREREQUISITES TO ISSUANCE OF PERMITS; PERMIT EXPIRATION; TEST TEES.
   (a)   Before anyone connects or reconnects into the sanitary and/or storm sewerage system, all permit fees and bonds required by this chapter shall be paid to the Finance Director. Once the sewer permit is issued, it shall expire within ninety days after the start of construction of the sanitary and/or storm sewerage connection.
   (b)   Any time an existing lateral is repaired or reconstructed, and if there is no test tee, a test tee shall be installed by the owner before the repair or reconstruction is accepted.
   (c)   The test tee shall be located not farther than five feet from the exit point of the foundation, whether it is a sanitary and/or storm sewer lateral. When transition is made, the test tee will be installed after transition.
(Ord. 1986-47. Passed 6-11-86; Ord. 2000-39. Passed 4-12-00.)