(a) A sewer tap-in charge of one thousand dollars ($1,000.00) is required of every residence on which a new construction permit is issued, and a tap-in fee of one hundred fifty dollars ($150.00) is required for each reconstruction permit issued. A sewer tap-in charge of two thousand dollars ($2,000.00) is required of every multi-family property on which a new construction permit is issued, and a tap-in fee of four hundred dollars ($400.00) is required fro each reconstruction permit issued. A sewer tap-in charge of three thousand dollars ($3,000.00) is required of every commercial, industrial, or public or quasi-public property on which a new construction permit is issued, and a tap-in fee of five hundred dollars ($500.00) is required for each reconstruction permit issued. An inspection charge of seventy-five dollars ($75.00) is required of every residence or place of business on which a construction or reconstruction permit is issued. For commercial, industrial, or public or quasi-public properties, if a municipal inspector needs to be on a construction site to observe and/or inspect work for more than one-half hour, the permit holder will be billed at the rate of forty- two dollars ($42.00) per hour. The project manager or project foreman shall sign an inspection time sheet identifying the time period the inspector was present for the inspection. A minimum extra time inspection fee of seventy-five dollars ($75.00) shall be charged. The reinspection fee shall be forty dollars ($40.00).
(b) The tap-in and inspection charge shall be paid upon the issuance of a building permit or authority to make a connection to the sewer system of the Municipality. Any additional inspection charges owed pursuant to subsection (a) above shall be paid after receipt of an invoice from the Village for such charges and prior to receipt of final approval to utilize a connection to the sewer system of the Municipality.
(c) For purposes of this section, “sewer system” refers to storm and sanitary sewers. (Ord. 1999-52. Passed 8-11-99; Ord. 2008-61. Passed 10-22-08; Ord. 2013-41. Passed 5-8-13.)