The datum or zero point for all engineering works under the direction and control of the City is established as mean sea level, as determined by the observations of the United Stales Coast and Geodetic Survey, and all grades and elevations hereafter established by the City shall refer to this datum. (Ord. 36. Passed 8-17-18.)