A required off-street loading space shall be at least 12 feet wide by 40 feet in length. This area shall be exclusive of the maneuvering space, and each loading facility shall have a vertical clearance of at least 14 feet. Buildings of less than 5,000 square feet of floor area shall be provided with receiving platforms or other commensurate facilities. (Ord. 474. Passed 8-27-73.)