951.05 BRACEVILLE WATER LINE PROJECT TAP FEES.
   The following rates are hereby established for connections to the Braceville water line for services installed during construction of such line:
 
Tap Size (inches)
Fee (dollars)
3/4
$ 200.00 including meters
1
250.00 including meters
1 ½
300.00 including meters
2
350.00 including meters
4
Meter price plus $150.00 times 125%
6
Meter price plus $200.00 times 125%
   
(Ord. 3476. Passed 7-14-80.)