§ 156.160 INSPECTION.
   (A)   All construction shall be inspected by the Public Works Director or a designated representative. Laboratory and field tests shall be taken when necessary. No construction will be permitted without proper inspection or accepted with unfavorable inspection or test reports. Inspection costs will be paid to the city by the developer at cost of salaries plus administrative cost plus laboratory testing fees.
   (B)   Construction of streets and dedicated public utilities will be accepted by the city only upon:
      (1)   Final inspection by Public Works Director;
      (2)   Posting of all required bonds;
      (3)   Public Works Director’s certification of compliance with plans and specifications; and
      (4)   Payment of all inspection costs and laboratory fees.
   (C)   Public improvements are considered completed and accepted once a signed certificate by the Public Works Director has been approved by City Council. The certificate shall state that all required public improvements have been completed according to the construction plans submitted to the city as well as meeting or exceeding accepted engineering design practices and were built to city specifications.
(Ord. 2217, passed 11-4-2013)