§ 154.206 CONSTRUCTION REQUIREMENTS.
   All small wireless facility installations shall comply with the following:
   (A)   All needed traffic control shall comply with the most recent version of the Manual on Uniform Traffic Control Devices.
   (B)   Any needed lane closures on arterial roadways shall not start before 8:00 a.m. and end no later than 4:00 p.m. local time.
   (C)   Installations shall foster an aesthetically pleasing environment, prevent visual blight, protect and preserve public safety and general welfare, and maintain the character of residential and nonresidential areas consistent with the adopted plans and compliance of applicable state and federal legislation.
   (D)   All disturbed or damaged ROW shall be hydro-seeded, seeded with erosion mat or replaced with sod as soon as completed. Areas shall be maintained by the permittee until satisfactory growth is established. Permittee shall water all seeded or sodded areas as needed until established growth is achieved.
   (E)   Any damage to existing lawn irrigation systems within the public right-of-way is the responsibility of the permittee to repair.
   (F)   Installations shall maintain a minimum distance of 15 feet from existing trees in the ROW.
   (G)   Only equipment necessary for the installation of small wireless facilities can sit on the right-of-way. Large trucks must stay on a hard surface at all times. No equipment can be left on the right- of-way overnight. Large trucks and equipment shall not drive or park on sidewalks and bike trails.
   (H)   Work cannot take place during any periods of snow removal operations by the city, either plowing or hauling of snow.
   (I)   The city reserves the right to deny any future projects with the permittee if the permittee has failed to follow the aforementioned construction requirements on a previous permit.
(Ord. 2376, passed 5-19-2020)