§ 52.055 INCREASED INDUSTRIAL LOADS.
   Any industry desiring to introduce wastes into the sewer system, which is not doing so as of the effective date of this chapter, or any industry desiring to expand in a manner which will increase their discharge of waste, or will change the nature of the waste discharged into the sewer system shall submit to the authorized city representative a report of the amount and character of waste proposed to be discharged into the sewer; said report shall be submitted at least 60 days prior to the first date of discharge into the sewers.
(2011 Code, § 24.0412) Penalty, see § 52.999