Project Name and Section:
Date of Completion: Contractor/Developer
Breakdown and Lineal Feet of Utility:
SEWER | WATER | |||
Length | Material | Length | Material | |
2" | ||||
3" | ||||
4" | ||||
6" | ||||
8" | ||||
10" | ||||
12" | ||||
# of Laterals Length # of Services: 1" 1-1/2"
# of Manholes
Lift Station: y / n | # of 2" gate valves | ||
Pump Manuf./ Model: | # of 4" gate valves | ||
Phase/Hertz/Volts/hp: | # of 6" gate valves | ||
Wet well diameter: | # of 8" gate valves | ||
Capacity: | # of 10" gate valves | ||
Depth: | # of 12" gate valves | ||
Forcemain Size: | # of 16" gate valves | ||
Forcemain Length: | # of 18" gate valves | ||
No. of Air Release: | # of gate valves | ||