2.15 FLOOD CONTROL.
A.   The petitioner shall assure that:
   1.   The subdivision will minimize flood damage;
   2.   That public utilities and facilities are constructed so as to minimize flood damage;
   3.   Adequate drainage is provided;
   4.   Base flood elevation data shall be required for subdivisions greater than 50 lots or five acres.