2.06 WATER.
A.   The subdivider shall provide the subdivision with a complete water main supply system, which shall be connected to the Town water utility system; except, that when such water supply is not available as determined by the Commissioner, the subdivider shall provide an individual water supply on each lot in the subdivision in accordance with requirements of the Commissioner. The water supply system shall be designed and constructed in accordance with the "Recommended Standards for Water Works."
B.   The plans for the installation of a water main supply system shall be provided by the subdivider and approved by the Commissioner and the Health Officer. Construction of water mains and house services to be placed within the improved portion of the street right-of-way shall be completed prior to the placement of the surface improvements. Upon the completion of the water supply installation, two (2) sets of the plans for such system as build shall be filed with the Commissioner.
C.   Any new hydrants, fire or dry, that are installed within a subdivision shall have a 5 inch Storz connection on them.
(Am. Ord. 110219, passed 11-2-2019)