1109.01 CONSTRUCTION PROCEDURE AND MATERIALS.
   The subdivider's engineer shall design and the subdivider shall construct improvements not less than the standards outlined in these regulations. The work shall be done under County supervision/inspection and shall be completed within a reasonable period of time as determined by the Commission. The minimum requirements for materials shall be in accordance with the standards of the current volume of "Construction and Material Specifications" of the State of Ohio Department of Transportation, and the requirements of the Ohio Department of Health.
(Ord. 88-1. Passed 6-23-88.)