1181.03 APPLICATION AND ISSUANCE OF ZONING CERTIFICATES.
   (a)   Written application shall be made for a zoning certificate for the construction of a new building or the alteration of an existing building. Said certificate shall be issued within ten (10) working days after a complete written request for the same has been made to the Zoning Inspector or his agent, provided such construction or alteration is in conformity with the provisions of this Ordinance.
   (b)   Every application for a zoning certificate shall be accompanied by a plan in duplicate and such other plans as may be necessary to show the location and type of buildings to be erected or alterations to be made. Where construction or physical improvement of the land is involved, the lot and location of the buildings to be built thereon shall be staked out on the ground before construction is started, and all dimensions shown on filed plans shall be true. Each plan shall show:
      (1)   The street providing access to the lot and the exact location of the lot in relation to the nearest cross street.
      (2)   The name of the plan, if any, and the lot numbers of the abutting properties.
      (3)   The actual dimensions of the lot, the yard and other open space dimensions thereof, and the location and size of any existing structure thereon.
      (4)   The location and size of the proposed structure and/or the proposed enlargement of the existing structure.
      (5)   Any other information that, in the judgment of the Zoning Inspector, may be necessary to enforce this Ordinance.
   (c)   The Zoning Inspector shall not issue a zoning certificate for any application requiring site plan review by the Planning Commission, unless the proposed site plan has been approved by the Commission. The Zoning Inspector also shall not issue a zoning certificate for any application requiring a certificate of appropriateness from the Design Review Board according to Section 1157.06.
(Ord. K-5-94-2. Passed 5-9-94.)