1117.14 UTILITIES GENERAL.
   (a)   After grading is completed and approved and before any base is applied, all of the underground work, water mains, gas mains, etc., and all service connections shall be installed completely and approved throughout the length of the road and across the flat section. All driveways for houses to be built by the developer shall be cut and drained.
   (b)   All utilities shall be placed in streets before roadway surfacing is attempted. Taps for sewer, water, gas and any other utilities underground shall be extended ten feet (10') into the property line before roadway surfacing is done.
(Ord. 2019-4. Passed 10-14-19.)