1117.02 CONSTRUCTION PROCEDURE AND MATERIALS.
   The subdivider shall design and construct improvements in accordance with the "Construction and Material Specifications" of the State of Ohio Department of Transportation, Ohio Environmental Protection Agency and the Village of New Concord. All inspection costs shall be paid for by the subdivider, and all work shall be done under Village of New Concord supervision.
   (a)   The Village of New Concord requires that plans be drawn, including specifications for material and equipment to be incorporated in the work, all in accordance with its standards and specifications. All improvements shall be installed, tested and sterilized where applicable under the immediate and direct supervision of the Village Engineer.
   (b)   All provisions of the current Village of New Concord construction specifications shall be strictly complied with in the construction of improvements or appurtenances thereto. Under no conditions shall the Municipality accept an improvement and connect it to the municipal system unless the work has been done in accordance with these standards, including plan preparation, furnishing of materials and installation under the direct supervision of the Village Engineer or his authorized representative.
   (c)   The developer is cautioned that unless otherwise specifically authorized operation of municipal system valves, hydrants or other appurtenances or removal of any system pipe, fittings, special services or appurtenances is not permitted by other than municipal personnel. The contractor is required upon completion to furnish all equipment and supplies necessary to pressure test and sterilize utility improvements in accordance with municipal specifications.
   (d)   Upon an approved pressure and sterilization test report and the receipt of a one year, 50 percent maintenance bond, the utility shall be certified for service taps.
      (Ord. 2019-4. Passed 10-14-19.)