§ 98.33  BUILDING COMMISSIONER'S DUTIES.
   The location of all sewer or utility connections and the manner in which all excavations, for whatever reason, are made shall be approved by the Building Commissioner, and the sewer connections shall be inspected before excavations are closed.
('80 Code, § 22-21)