(a) Generally. The subdivider shall construct or install the necessary ditches or closed sewers to drain the property in question completely and to dispose of the storm water to the satisfaction of the Director of Public Service and the Municipal Engineer. Open ditches are not permitted in finished subdivisions.
In utility transition areas where lots are platted as specified in Chapter 1234, the required improvements, with the exception of water and sanitary sewer lines, shall be as required of lots comparable in size to half of a utility transition area lot, unless sidewalks are waived by Council.
(b) Use of Existing Public System Required. When a public storm sewer is accessible, as determined by the Director of Public Service, the developer shall connect with the public system. Storm drainage is not permitted in sanitary sewers.
(Ord. 83-32. Passed 8-15-83.)