(a) All charges outlined in Section shall be in force and take effective August 1, 1978 and shall apply to all connections made thereafter.
(b) Any building or structure under construction on or before July 31, 1978, will be permitted water connections at the rates outlined in Ordinance 73-14, passed April 16, 1973. As used in this section, "under construction" applies to buildings or structures which have:
(1) Footers in;
(2) Slabs poured or subflooring down;
(3) The proper size water pipe from the building or structure to the curb or curb box; and
(4) Had the tap-in fees paid.
(Ord. 21-78. Passed 6-27-78; Ord. 2022-15. Passed 5-16-22.)