1040.19   TAPS AND INSTALLATIONS; LINE SIZE REQUIREMENTS.
   (a)   The contractor, with approval of the Director of Public Service, will tap the water line, or pay the municipality to tap said water line as indicated below:
      (1)   Charges for such work shall be established on a case-by-case basis by the Director of Public Service and shall include all costs of labor, material and equipment used.
      (2)   Installation of service lines from curb box to dwelling or other premises and installation of other water lines shall be made by only those persons approved and authorized by the Municipality.
      (3)   Payment for such installations shall not relieve the property owner from securing and paying for permits as required by Section 1040.17.
    (b)   Minimum branch requirements for buildings for residential use are as follows:
Number of Units
Water Service Line Size (in inches)
Number of Units
Water Service Line Size (in inches)
1 - 2
3/4
3 - 5
1
6 - 12
1-1/2
13 - 20
2
21 - 40
3
41 - 100
4
100 - 250
6
251 or more
8
(Ord. 85-51. Passed 11-4-85; Ord. 2022-15. Passed 5-16-22.)