(A) All off-street loading spaces shall be located on the same lot as the use served.
(B) No off-street loading spaces shall be located between the front lot line and the front façade of any portion of the building served; provided, however, in the case of a double frontage lot, off-street loading spaces may be located between a front lot line of a perimeter street and the rear of the building served if: no access is provided across the front lot line; and the yard between the off-street loading spaces and the front lot line is landscaped in compliance with the regulations of §§ 152.185 through 152.194 for a Type C: Full Screening landscaping.
(C) All off-street loading spaces shall be oriented toward a side lot line or rear lot line.
(D) No off-street loading spaces shall be located in a required side yard, required rear yard, required side residential bufferyard or required rear residential bufferyard.
(E) Office, professional services, retail, or other non-industrial uses may provide 1 required loading space per building in a “pull-off” loading area located adjacent to an interior access drive. A “pull-off” loading area shall not be subject to the prohibition against being located between the front lot line and front façade of any portion of the building served set forth in division (C) above.
(Ord. 1221, § 8.05(c), passed 1-26-2010)