§ 53.32 ADDITIONAL FACILITIES.
   A request for new service shall be submitted to the Electric Superintendent. When a request for new service is approved, the utility will provide facilities to allow for the installation of fixtures, ornamental poles, underground and overhead conductor, wooden poles, and the like, as well as other improvements to the electric distribution system necessary to properly service the addition load added to the distribution circuit. The improvements required shall be determined by the Electric Utility Superintendent. The customer will pay in advance all costs to be incurred for the installation of the facilities required to supply service from the most suitable existing pole, transformer, or pedestal of the utility to the point designated by the customer for the installation, as well as the other distributions system improvements required to provide adequate service to the new connection.
(Ord. 1242, passed 4-26-2011; Am. Ord. 1311, passed 6-11-2015)